Mechanical
Heating and cooling design
Heating and cooling design — HVAC loads, plant selection and a control philosophy that can be commissioned.
- Discipline
- Mechanical
- Typical timescale
- 2 to 3 weeks for concept, 6 to 10 weeks for technical design
WHAT IT IS
Heating and cooling design determines how a building is warmed and cooled: the system type, the plant, the distribution, and the control strategy that makes them work together. It is the H and the AC of HVAC — the V is covered separately under ventilation design, and on most projects the two are designed as one system.
The system selection is the consequential decision. It sets plant space, riser sizes, incoming supply capacity, maintenance burden and a large share of the building's operational carbon for the next twenty years. SDE appraises options against the brief at concept stage, when changing the answer is still cheap.
WHEN YOU NEED IT
On any new build, extension, refurbishment or change of use where the existing systems cannot serve the proposed occupancy — and on any project where a Part L or Section 6 compliance route depends on plant efficiency.
Also where an existing building overheats, has poor air quality, or has plant that is failing and needs replacing with something that will still be compliant in ten years' time.
OUR PROCESS
Loads first, then system selection, then plant, then controls — in that order. Selecting plant before the load is calculated is how buildings end up with oversized boilers running at poor part-load efficiency for their entire life.
Where the brief allows it, two or three system options are modelled and compared on capital cost, running cost, carbon and space requirement, and the comparison is issued rather than summarised.
DELIVERABLES
What you receive
- System options appraisal
- Heat loss and heat gain calculations
- Plant selection and schedules
- Ductwork and pipework sizing
- Coordinated HVAC drawings
- Control philosophy
STANDARDS
Standards applied
The editions in force at the time of design. Where a standard is amended mid-project we confirm which edition the appointment is based on.
QUESTIONS
Common questions
What is included in an HVAC design?
An HVAC design includes calculated heating and cooling loads, system selection, plant sizing and selection, ductwork and pipework sizing, coordinated drawings, equipment schedules and a control philosophy. It is issued to a standard a contractor can price and install from.
How much plant space does a building need?
It depends on the system selected, not on floor area alone. Plant space is determined during concept design once the load is known and the system type is chosen, which is why the mechanical designer needs to be appointed before the architectural layout is fixed.