MEP design fee estimator

Enter the building type and floor area to get an indicative fee range for mechanical, electrical and public health design. Normally confirmed by an engineer within one working day of receiving the drawings.

Project details

800 m² per storey. Use the gross internal area of the whole building, measured to the inside face of the external walls.

RIBA stages required
Additional services

New homes are assessed under BREEAM UK New Construction: Residential — the scheme that was the Home Quality Mark until BRE renamed it in April 2025 — rather than the non-domestic BREEAM scheme. It scores each home individually and accounts for the common areas, and the MEP contribution is the energy, water and ventilation evidence. What this covers.

Indicative fee range

Working it out…

METHOD

How the estimate is calculated

The same method SDE uses internally to price work, exposed directly rather than described. It runs in three steps.

  1. 01

    Floor area to construction value

    A benchmark MEP construction cost per square metre for the building type is applied to the gross internal floor area. This gives the value of the mechanical, electrical and public health installation — not the value of the whole building.

  2. 02

    Construction value to fee percentage

    A fee percentage is applied on a sliding scale. Larger installations carry a lower percentage because design effort does not rise in proportion to value. Regional and specification factors are applied, and BIM delivery is added where required.

  3. 03

    Fee to stages

    The full design fee is apportioned across RIBA stages — Stages 1 to 3 account for around a third, Stage 4 for over half, with the balance across construction and handover. You are charged only for the stages you appoint.

The estimate is cross-checked against an hourly breakdown of the duties included in the appointment. Where the two disagree materially, that usually indicates a scope question worth resolving before a fee is agreed — which is why an engineer confirms every figure.

QUESTIONS

Common questions about MEP design fees

How is the MEP design fee calculated?

A benchmark construction cost per square metre for the building type is applied to the gross internal floor area to give an MEP construction value. A fee percentage is applied on a sliding scale by project value, then adjusted for region and specification level, and finally apportioned across the RIBA stages you select.

Why does the estimator return a range rather than a fee?

Because a precise figure produced from a floor area alone would imply a commitment that cannot be honoured before the drawings have been seen. The range reflects genuine pre-drawing uncertainty. An engineer normally confirms the fee within one working day of receiving the drawings.

What is gross internal floor area?

GIFA is the total floor area of the building measured to the inside face of the external walls, including all storeys, circulation and plant space. It is measured in accordance with the RICS Code of Measuring Practice.

Does the fee percentage change with project size?

Yes. MEP design fees fall as a percentage as construction value rises, because the design effort does not scale linearly with size. The estimator applies that sliding scale automatically; the fee proposal issued after an engineer has seen the drawings sets it out in full.

Why is a mechanical-only fee not half a full MEP fee?

Because roughly half the design work disappears and almost none of the overhead does. Mobilisation, the site survey, reading the architect’s information, coordinating with the other discipline’s designer — who on a split appointment is a third party rather than a colleague — checking and issue are all much the same whether one service is being designed or three. A single-discipline appointment is priced at around 60 per cent of the full MEP fee.

What does the BREEAM option cover?

The building services engineer’s contribution to a BREEAM assessment: the evidence and modelling behind the energy, water and pollution credits, and liaison with the assessor. It does not include the licensed BREEAM Assessor, who is appointed separately and carries their own fee.

Does BREEAM apply to new homes, or is that the Home Quality Mark?

Both, under one scheme. New-build self-contained homes — houses, and flats in a block — are assessed under BREEAM UK New Construction: Residential, which is what the Home Quality Mark became when BRE brought it into the BREEAM range in April 2025. It scores each home individually and accounts for the shared areas, rather than assessing the block as a single non-domestic building. Buildings that house people without being self-contained homes — hotels, care homes, halls of residence, anything with shared living space or on-site support — stay under BREEAM Multi-residential in the non-domestic scheme. Selecting housing or flats in the estimator prices the residential scheme; the MEP contribution is the energy, water and ventilation evidence either way.

Why is BREEAM support not proportional to the design fee for a single stage?

Because the two roles are not the same shape. Design effort concentrates in the early stages and drops sharply once the drawings are issued. The BREEAM role does not: Stage 5 is when material and equipment substitutions have to be checked against the credits that were claimed and the as-built evidence is assembled, which is where credits are most often lost. A construction-stage appointment therefore carries a larger share of the BREEAM fee than it does of the design fee.

Is an EPC part of the design fee?

No. A non-domestic Energy Performance Certificate has to be produced and lodged by an accredited assessor at Level 3, 4 or 5 depending on the services installed, so it is a cost passed through rather than design fee. The estimator shows it as its own line for that reason.

Is the estimate a quotation?

No. It is indicative only and is not a contractual offer. A fee proposal is issued after an engineer has reviewed the drawings and confirmed the scope, deliverables and programme.

Can I get an estimate from a drawing rather than a floor area?

Drawing upload is the next stage of this tool. In the meantime, send the general arrangement drawings to SDE and an engineer will normally take off the area and confirm a fee within one working day of receiving them.