BUILDING CONTROL
The statutory route here
Birmingham projects follow the Building Regulations 2010 and the Approved Documents, with approval through Birmingham City Council building control or a registered building control approver.
Birmingham's commercial stock includes a large quantity of 1960s and 1970s buildings now being refurbished rather than replaced. The characteristic services question on those is whether the existing incoming capacity, riser provision and floor-to-floor height can support current occupancy standards and current plant, and that is a survey question before it is a design one.
Floor-to-floor height is the one that most often decides whether a scheme works. A building designed around a small amount of ductwork and a fluorescent luminaire has to absorb a modern ventilation rate, a heat recovery unit, sprinkler pipework and a fire-rated ceiling in the same void, and the answer is either a lower ceiling, a different air strategy or a different building. Establishing it early is what stops a scheme being designed twice.
Birmingham's tall residential development also brings the Building Safety Act 2022 gateway regime into play. Where a project is a higher-risk building — generally at least 18 metres or seven storeys with two or more residential units — the Building Safety Regulator is the building control body rather than the council, and approval is required before construction starts.
HOW WE WORK
Birmingham sits at the centre of a conurbation with six other unitary authorities immediately around it — Solihull, Sandwell, Dudley, Walsall, Wolverhampton and Coventry — so the first thing worth confirming on a West Midlands project is which one the site is actually in. Building control, planning policy and fees all follow the boundary rather than the address.
On the refurbishment work that makes up most of the city centre pipeline, SDE surveys before designing. What matters is measured: incoming electrical capacity and the position of the intake, the actual clear void between structure and ceiling rather than the figure on the record drawing, riser space that is available rather than riser space that is drawn, and the condition of anything intended to be retained.
AUTHORITIES
Local authorities in this area
QUESTIONS
Common questions
Who deals with building control for a Birmingham project?
Birmingham City Council building control, or a registered building control approver appointed instead — unless the project is a higher-risk building, where the Building Safety Regulator is the building control body and there is no choice. Confirm the boundary first: Solihull, Sandwell, Dudley, Walsall, Wolverhampton and Coventry are separate authorities, and a West Midlands address is often not a Birmingham City Council one.
What usually limits an office refurbishment in Birmingham?
Ceiling void depth and incoming capacity. Much of the city centre commercial stock dates from the 1960s and 1970s and was built around far less servicing than a modern fit-out needs — current ventilation rates, heat recovery, sprinklers and a fire-rated ceiling all have to share a void designed for a fraction of it. Measure the clear void and the intake capacity before the layout is set, because the alternative is finding out at coordination that the scheme needs a lower ceiling or a different air strategy.