TM65 embodied carbon assessment
Embodied carbon of MEP systems to CIBSE TM65, for whole life carbon assessments and for choosing between plant on more than capital cost.
- Discipline
- Sustainability
- Typical timescale
- 2 to 4 weeks once the plant selection is stable
WHAT IT IS
CIBSE TM65 is a calculation methodology for the embodied carbon of building services equipment — the carbon in making, transporting, maintaining and disposing of the plant, as distinct from the carbon of running it.
It exists because most MEP products have no environmental product declaration. Where a manufacturer has published a verified EPD to BS EN 15804, that figure is used. Where none exists, which is still the common case, TM65 provides a structured estimate from the product's material composition and mass, with an uncertainty factor applied so the answer is honest about being an estimate rather than a measurement.
Building services matter here more than their volume suggests. As fabric improves and operational carbon falls, the proportion of a building's whole life carbon sitting in its plant, pipework, ductwork, cabling and replacement cycles rises — and services are replaced several times over a building's life, so the recurring embodied carbon can exceed the initial figure.
WHEN YOU NEED IT
Where a whole life carbon assessment is required — by planning policy, by a funder, by a BREEAM Mat 01 credit, or by a client target such as the RIBA 2030 Climate Challenge or a LETI benchmark — and the MEP contribution has to be quantified rather than excluded with a note.
Also on any project where two plant options are close on capital and operational cost. That is the point at which embodied carbon is the deciding factor rather than a reporting exercise, and it has to be assessed while both options are still live.
OUR PROCESS
Scope first: which systems are included, which life cycle modules are assessed, and what the study is for. An assessment covering only product stage A1 to A3 answers a different question from one covering replacement and end of life, and the two are not comparable.
Verified EPD data is used wherever a manufacturer publishes it. Where it does not exist, the TM65 methodology is applied from the product's own material and mass data, with the uncertainty factor stated rather than quietly absorbed into the total.
Results are reported per system and per life cycle module, not as a single number. A total tells a client nothing they can act on; a breakdown shows which system, and which decision, is worth revisiting.
The assessment is handed over with its assumptions, its data sources and its gaps written down, so it can be updated as the design develops rather than repeated from scratch.
DELIVERABLES
What you receive
- Embodied carbon assessment of MEP systems to TM65
- Scope and life cycle module statement
- EPD data used, and TM65 estimates where none exists
- Results broken down by system and by module
- Input to the whole life carbon assessment
- Assumptions, data sources and gaps register
STANDARDS
Standards applied
The editions in force at the time of design. Where a standard is amended mid-project we confirm which edition the appointment is based on.
- CIBSE TM65Embodied carbon in building services — a calculation methodologyCIBSE
- BS EN 15978:2011Sustainability of construction works — assessment of environmental performance of buildings — calculation methodBSI
- BS EN 15804:2012+A2:2019Core rules for the product category of construction products — environmental product declarationsBSI
- RICS Whole Life Carbon AssessmentFor the built environment, 2nd editionRICS
- BREEAM Mat 01Environmental impacts from construction products — life cycle assessmentBRE
- RIBA 2030 Climate ChallengeEmbodied carbon targetsRIBA
QUESTIONS
Common questions
What is CIBSE TM65?
CIBSE TM65 is a methodology for calculating the embodied carbon of building services equipment where a manufacturer has not published an environmental product declaration. It estimates the figure from the product’s material composition and mass and applies an uncertainty factor, so that MEP can be included in a whole life carbon assessment rather than left out for lack of data.
How is TM65 different from an EPD?
An environmental product declaration is a verified, third-party-checked figure published by the manufacturer for a specific product, to BS EN 15804. TM65 is an estimate made by the assessor when no EPD exists. Where an EPD is available it is used in preference; TM65 fills the gap, and the resulting figures carry a stated uncertainty because of it.
Does embodied carbon in building services really matter?
It matters more as buildings improve. Operational carbon falls with better fabric, efficient plant and a decarbonising grid, which raises the share of whole life carbon held in materials — and building services are replaced several times across a building’s life, so their recurring embodied carbon accumulates in a way that structure and fabric do not.